MK Diamond Acquires Sawtec

Words: Dan Kamys

MK Diamond Acquires Sawtec
MK Diamond Products Inc. acquired the Sawtec brand from Blastrac NA. The Sawtec brand provides contractors with a range of dust-free tools and grinding accessories for surface preparation and concrete repair. Sawtec will be marketed as a sub-brand of MK Diamond, which will preserve its successful reputation and brand identity within the construction industry.

The acquisition combines one of the oldest family-owned leaders of cutting tools with a new line of products for surface preparation.

The Sawtec product line will include surface preparation equipment, dust-free tools for cutting and widening joints, grinding accessories and shrouds.

Insurance Shouldn’t be Scary

Navigating the world of insurance can be daunting, especially for masonry contractors in need of quality coverage and risk management support for their complex and unique circumstances. Yet, working with your insurance company shouldn’t be a haunting expe

Understanding OSHA Regulations for Masonry Contractors in the USA

Masonry contractors in the USA must adhere to Occupational Safety and Health Administration (OSHA) regulations to maintain a safe work environment. OSHA, the federal agency responsible for worker safety, sets stringent guidelines to protect workers from t

About: Featured
InDigital Partners with the Mason Contractors Association of America to Elevate Video Content in the Masonry Industry

InDigital, a leader in digital media solutions, is thrilled to announce a new partnership with the Mason Contractors Association of America (MCAA). This collaboration will focus on leveraging InDigital’s expertise in video content creation to transform

Building Correctional Facilities with Strength and Efficiency: Amerimix Provides Solid Results for Construction of Louisiana Correctional Institute for Women

The Louisiana Correctional Institute for Women (LCIW), located in the heart of St. Gabriel, Louisiana, needed a complete rebuild after damage from a devastating flood in 2016. The inmates were relocated to other prisons from 2022 to 2024 while the series