The Problem with Competitive Bid (... and the Never-Ending Quest for Value)
I 'm a builder - and that's difficult enough - but the problem with being a builder
and discussing competitive bid is that anything negative that I may say against this
age-old construction award procedure can come off like whining - and runs the
ever-present risk of sounding like the bitter, knee-jerk protestations of someone who
just came in second at a bid-letting. But despite this hazard (and my handicap), I'll
give it a try.
The problem is the competitive bid process itself. It has - to be politically correct
- "issues". And it appears I'm not the first to have noticed. Indeed, it's
difficult to pick up any construction industry publication nowadays and not encounter
some discussion on competitive bid and its shortcomings. The articles cover similar
subject matter and generally trumpet the benefits of negotiated an/or design/build
work while chastising competitive bid. They come replete with the varying slants,
prejudices, and convictions of the author (just like this article), but regardless the
theme or eventual conclusion of the piece, there is always a recurring anthem - a
common thread - allying all of these discussions: the element of trust.
The trust (or more accurately - the lack of trust) I'm referring to is that between
the players in a typical construction deal - the project owner, builder, and
architect. The problem? We don't trust each other. We say we do, but we don't. But
why? Well, there are a myriad of reasons encompassing a long, sordid history and
reactionary human elements that go into explaining why. Unfortunately, a truly
complete and comprehensive discussion would be hardly containable in one book, let
alone one magazine article. So suffice it to say that there have been some
misunderstandings.
But this complexity does pose a problem for the person attempting to explore the
subject. With the cause and effect so sweeping, complex, and ethereal, it can be
quite difficult to focus on the "big picture" (the linear argument of competitive bid)
without being drawn off into peripheral and spontaneous side-issues. So, for clarity
sake, let's break down our discussion into smaller, more manageable illustrations -
taken from my own experiences - to show, from the builder's standpoint at least, how
and where trust can fall prey to eroding and degrading elements. Though admittedly
bias, I hope that through these illustrations the reader can glean a better
understanding of the mind set of the GC and the effect of the competitive bid process
on the typical builder.
So, with these ground-rules in mind, I'd like to offer some reflections on the
competitive bid process (CB) and why CB, by it's very nature, drives damaging and
detrimental wedges between the construction team players (the owner, architect, and
builder) who's true goal should be to work together as a team to achieve a successful
and similar end.
The Competitive Bid Process
When applied to the construction industry, competitive bidding is the simple pitting
of two or more building companies against one another in a pricing competition for a
particular building project. From (ideally) identical bid packages - commonly
consisting of architectural working drawings, specifications, and other information
such as addenda - the competing companies analyze, estimate, and agonize over the
documents in an attempt to arrive at a true and competitive price for the completion
of the project.
Before a pre-determined deadline, the combatants deliver their completed bid form(s)
to the owner's representative. In their signed proposals, they include all requested
cost items along with any additional information requested of the contractor by the
owner and architect. This may include items such as bonding info, sub-contractor
listings, material suppliers, applicable affidavits, and more. Once received, the
bids may or may not be read aloud. If read aloud, for all the world to hear, the
opening is known as an open letting. At a closed letting, the bids are opened by
the owners (or their representatives - often the architect) in private session at an
unannounced time and location. Once read, the results then may or may not be made
public to the bidders.
Now, of course, the good thing - from the builder's point of view - about the open
letting is that he knows (from a pricing standpoint, at least) where he stands. In the
closed letting scenario, it may be days, weeks, or (yes) even months before the
bidders are notified with results. Sometimes they're never notified. These
occasional long, silent waits are quite frustrating to the builder attempting to
schedule manpower requirements based on known work load. This lack of communication by
the architect and owner (either yes or no - just tell us something!) is one small
example of the erosion of trust that can occur through a (perceived?) lack of respect
for the effort that the bidders put into their proposals.
But, even the open letting has its perils. Being announced low at the letting
(although generally a pretty positive sign) doesn't necessarily assure the builder of
getting the job. There's almost always some type of jargon in the bid specifications
that gives discretionary power to the owner to choose the contractor that best suits
the overall needs of the project. Now this is a pretty obtuse directive and was
likely included as a tool to "weed out" inexperienced or unqualified contractors.
Unfortunately, what it means to the builder is that the owner and architect may choose
virtually whomever they please, for whatever reasons deemed appropriate. This rather
lop-sided caveat detracts greatly (in the builder's mind) from the oft-expressed
fairness doctrine of the open letting scenario. And so, just like that, another bit
of trust slips away!
Now, you may say, "C'mon, these are isolated incidents...no system is perfect. CB's
still the best game in town." "After all, the owner's the one with the money on the
line - he's got to have some control! Besides, CB just provides plain, old, healthy,
American competition - good everyone ... right?"
Well ... not exactly. There are other problems, like:
The Owner/Builder Relationship
This reason alone - if genuinely understood - should be enough to cause sane owners
to run screaming from CB. From a relationship standpoint, CB is a nightmare. Why?
Because the moment the owner has selected CB as the vehicle for establishing his
future contractual relationship with a builder, intrinsically, the following will
almost certainly result:
The relationship between the owner, architect, and the builder will become
adversarial. No, I don't mean there's going to be screaming and punching (well ...
maybe). In our context, the term adversarial simply means that the parties are now in
competition - financial competition - with one another, each protecting his or her
stake in the gamble (the building project). Once the gun is sounded, it's "1,2,3,
....grab-your-money" - and whoever grabs the most wins! And, yes, the architect is
grabbing right along with everyone else!
Next, the owner and builder now view one another as cold, detached, and uncaring
business entities. Since no real attempt was made to establish any genuine
understanding or empathy for the other's situation - none exists. There is no bond or
trust. There is no partnership or comraderie. The construction project becomes a
clinical, antiseptic, business transaction and if one party suffers in relation to
another's good fortune, then it's justifiable in the minds of all the players as
"protecting one's own interest."
If the project goes smoothly (few errors and change orders) than the relationship may
well stay civil - even friendly. But the hierarchy of need (and greed) never waivers:
money first trust, loyalty, and empathy last.
The Bid Documents
Another problem (and a huge misconception to the man on the street) are the bid
documents themselves. In my opinion - when discussing CB - the quality of the
architectural plans and specifications is the single biggest obstacle to the
competitive bid process ever being universally accepted. Throughout my career, the
majority of my experience in construction has been as an estimator. I've worked and
bid with scores of architectural firms and compiled hundreds of estimates. Over that
time, I've come to realize a tremendous disparity between the best and the worst in
the architectural field. Even more unsettling is that this trend towards mediocrity
appears to be getting worse rather than better.
The problem is real. Ever more frequently, I find myself involved in competitive
bids where - due to the absolute incoherent and/or incomplete state of the bid
documents, the only avenue left to me to arrive at my bid number was through my own
experience (and intuition) in determining the "intended" scope of work. Now, I'm no
genius, so assuming the other estimators are doing the same thing, what do you suppose
the odds are that we all interpret the documents the same way? Ever heard of
comparing "apples and oranges ?"
Now yes, I'm well aware that somewhere in the cacophonous specification it says that we should notify the architect of any mistakes, omissions, or discrepancies that we find (or something of the sort). I'm sure this passage sounded wonderful to the optimistic soul who created it, but the reality is that there are just way too many errors and omissions on many plans and specs. Even if the builder were so inclined (or allowed) to make the corrections, it would require an additional full-time draftsman/estimator (which we can't afford) to adequately detail and address the faulty and missing information.
But suppose we do make the call to the architect. Well, in a classic case of "damned
if you do - damned if you don't" - when we do call the architect (and we call a lot)
with questions or request for clarification, the odds are evenly spread that we'll
receive any one of the following:
- The right answer to our question
- The wrong answer to our question
- The architects voice mail (he will not call back)
- The receptionist - who will tell us the architect in question isn't in today
(the bid is due at 2 pm today)
- Or (my personal favorite) where I (finally) get an answer to my question, but
not before I'm made well aware (through the nasal, condescending tone at the
other end of the line) that I am no-where-near qualified and have no business
questioning the hallowed and sacred tablets know as the architectural documents.
Alright, so I got some shots in. My point is: most people (unfortunately, the very
same people who make up future owners) have always assumed that we bidders in a
competitive bid situation receive and bid off of complete, pristine, and professional
construction documents when the reality is that nothing could be further from the
truth! I'd personally estimate that perhaps 5% of the plans from which I prepare
bids are adequately complete to genuinely offer the owner an "apples to apples"
competition. Fifteen percent are pure folly; and the remaining percentage makes up
the middle ground between the best and worst. This means that - more often than we'd
care to admit - the low bidder on CB projects is likely arriving at his number through
a means other than a thorough and precise understanding of the construction documents
- hardly the way the (construction) founding fathers intended!
Why such poor quality architectural work? I don't really know. Perhaps it's
economically driven; the result of increased competition between architectural firms,
competition from design/build contractors, and/or deficient labor pools from which to
draw talented designers. It's also entirely likely that the percentages above would
apply to most other occupations (including we builders). It just seems different with
architects. Perhaps I'm being too rosy, but in my mind, architecture had always
enjoyed a somewhat pristine and unblemished reputation for accuracy and attention to
detail. Earlier in my career, architecture was synonymous with excellence and
reliability. Now I'm not so sure.
But, back to CB. Another bit of neurotic skepticism I've had to endure over the years
from my builder co-harts goes something like this: that the lack of information in the
bid documents is actually a pre-meditated and desirable element (created by the owner
and architect) of the CB process. This theory suggests that crucial information is
left out of the documents in order to (and here's the neurotic part) "trick" one of
the bidding contractors into being substantially lower than the pack - and then
legally and contractually forcing him to perform the work at a (below market value)
loss.
Now, I've never personally bought into this for two reasons. First, I (perhaps
naively) still believe that the people are simply too honest to stoop to that level,
and second, I don't think they're smart enough to pull it off without being exposed.
However, there is a lesson here. It's important to understand that there are members
of the building community who swear that this is true. We even have joke about it.
It's known as the "who-missed-what" method of construction award or (put another way)
"Congratulations(???), you're low!!"
Well, whatever you call it ... it isn't good. And whether it materialized through the
(unlikely) pre-meditated efforts of the owner/architect or just plain apathy,
incompetence, and laziness on the part of all the parties, including the builder
(far more likely), we in the building construction industry have allowed ourselves to
be slowly, but methodically, drawn into an award methodology that forces us to often
employ less than desirable and ethical strategies to achieve "success" including a
"who-can-stick-it-to-who" mentality that starts early in the bid process and remains
throughout closeout.
Many in our (the building) industry have become transformed into closet con-artists -
constantly on the lookout for ways to skirt the bid process (and our competition) in
order to gain necessary market share. Now, no matter what side of the fence you're on
regarding CB, it's clear that this is no way to conduct business - or life.
Here are some other observations regarding competitive bid:
It's become an actual bid strategy by many builders to simply not bid any (clear)
omissions in the bidding documents, knowing full well that there'll be a change order
to the owner after the bid is let. Now some of these items are captured in time to be
put out as an addenda - but many (most) aren't. The bidding builder's reasoning goes
like this: if he does make the extra effort to account for error, it almost always
results in the bid price going up, losing the bid, and rendering all his hard work for
naught.
So he doesn't correct the error and indeed ends up low at the letting - and is
awarded the job. The document errors that allowed him to be low aren't discovered
until well after the post-bid negotiations begin. At this point, the bidder asks for
more money. The owner and architect are too deep into the process to begin anew with
the next highest bidder - and besides, there's still the cost-difference between the
first and second place bidders that would have to be added back in. Also, keep in
mind the tremendous pressures that always exist on all the players to break ground on
the project. So, the owner bites his lip - accepts the add from the contractor - and
moves on.
The situation above becomes even more convoluted when the post-bid negotiations also
include value-engineering (cost-saving) ideas that are now needed because the
architect's budget estimate (the estimated budget cost for the project originally
given to the owner by the architect) was too low. Which happens a lot! Now, the
typical post-bid confusion is heightened due to the alteration, re-pricing,
re-drawing, and general mass chaos created in the name of cost-savings. With all the
re-pricing going on, it makes it that much easier for a scheming low-baller to make up
ground lost from being too low in the first place.
I've been to a lot of bid lettings and the simple fact is that, sometimes, there are
tremendous spreads between the lowest and the highest proposal amounts read. This
phenomena alone should immediately throw up a "red flag" to the owner - signifying
potential problems with the bid documents.
Despite what many people believe, we (builders) really have little competitive
advantage over one another when it comes to cost. With minor exceptions, we all
purchase the same building materials, labor, sub-contractors, and equipment for about
the same outlay. In truth, most of the time, the difference between winning and losing
is more a product of minor differences in overhead, profit margins, work load, and
just plain aggressiveness.
There are no tricks, no warehouses full of deep-discounted materials, and no mystical
technical knowledge that really distinguishes one builder from another. Indeed, if
you are searching for a difference, your time would be better spent examining the more
non-technical attributes such as integrity, experience, and reliability.
Unless there is a thorough pre-screening process for the bidding competitors, the
owner can quickly find himself with a veritable melting-pot of quality, experience,
and competency among those participating. A horrifying visual example of not having
this pre-qualification requirement is where the long-established, venerable,
bondable, and experienced building company gets beat out by Bill & Ted (who were
just laid off from the GM) and - since Monday - now call themselves B & T Builders.
This is truly a situation where the owner "gets what he pays for!"
It is quite expensive, in terms of office overhead and employee time, for builders to
prepare estimates for competitive bids. Couple this with the motivation provided by
possibly losing the potentially profit-generating work, and you have adequate (at
least in the builder's mind) justification to seek "advantages" over competitors
through less than laudable means. It's quite easy to surmise that the other guy is
doing it!"
In the past, I've read discussion regarding the possibility of owners offering a
stipend of some kind to all those (invited) bidders who bid their projects - to cover
some of the overhead expense. Although an excellent idea, to date, I've never received
(or ever heard of any builder receiving) remuneration for their estimate expense. Let
me know if you have.
Many old and established building companies simply don't do competitive bidding
anymore (for the all the reasons we've discussed). And why would they? They have
repeat clients and ongoing and trusting relationships. With these venerable companies
removed from the "bidding pool", the owner using CB is left (from the very beginning)
with a gaggle of less-experienced, less-responsible, and lower quality bidders.
By choosing CB, the owner loses the huge benefit of having the builder involved in the
value engineering process (VE). VE allows for expensive or superfluous items to be
reviewed (and possibly substituted or eliminated) before they become part of the
actual building package. There are ranges of quality in virtually e line item on a
construction estimate and many different products and applications can often be
considered - reducing the cost.
And these savings can be staggering. Why? Because (and listen carefully) - the owner
and architect (as reflected in their all-to-often ill-conceived and misguided
construction budget estimates) have no where near the expertise and knowledge of the
builder when it comes to knowing the cost of material, labor, sub-contractors, and
equipment. This is due simply to the fact that the builder works with these costs all
the time - day in and day out, while architects and (most) owners do not.
The total project schedule (from conception to carpet) is lengthened due to CB, due to
the fact that one phase (i.e. the plans must be fully conceived and completed) must
end before another begins. There's little overlap between - say - the design and
bid stage. With negotiated and design/build work, the design and bid processes are
performed concurrently. The total construction window is decreased and problems and/or
clarifications with the documents are handled by all players - working in unison -
along the way. Shorter schedules, of course, allow for cost-savings through interim
(construction) interest dollars, less down-time for the owner, reduced overhead costs,
and a much less stress-filled atmosphere for all involved.
So, If Not Competitive Bid - What Else?
As mentioned earlier, there are alternatives to competitive bidding. Unfortunately
they all involve trust. The most popular is the negotiated deal where the owner works
together with the builder from the beginning to create the project. If the builder
doesn't have in-house design services (most don't), an outside designer may also be
brought in as part of the team. Now, these relationships can branch off into a myriad
of contract structures such as cost-plus percentage or fixed- fee, guaranteed max,
lump-sum, and/or any combination and variation that the parties feel comfortable with.
The important thing is that the decisions are made as a partnership - from the very
beginning planning stage - with equal say given to all participants.
There is mutual trust. Even the accounting books are often opened up to the owner (or
his accountant) to peruse, as a gesture of good faith, so the owner may be content in
the knowledge that he's getting the best possible value - and the builder is content
that he's negotiated a fair (and less volatile) fee for his work - all this while
minimizing dispute and delays. Now, it's no secret that many architects see negotiated
and design/build deals as an assault on their turf - so you're probably not going to
find many recommendations from them any time soon. It's also entirely possible that,
indeed, I am letting my builder bias show through. But it's not out of greed. I
genuinely and sincerely believe the competitive bid process to be a seriously flawed
affair. I also believe that a partnership - built on respect, trust, and honest
negotiation is the only true avenue to real and mutual value to all parties.
And isn't value what it's all about?