CalStar’s Brick Products

Words: Dan Kamys

Spring 2015

New Products

CalStar

www.calstarproducts.com

CalStar’s brick products
CalStar’s brick products
CalStar’s brick products

CalStar’s brick products, including its specialty line, can significantly reduce a project’s environmental impact, the company says. For example, CalStar says that for a 100,000-brick project, specifying CalStar brick can:
Divert more than 85 tons of landfill waste
Avoid 210 tons of new raw material mining
Reduce CO2 emissions by more than 80,000 lbs (40 tons)
Save 500 million BTU of energy

The difference between these bricks and others is CalStar’s manufacturing process. These composite bricks are produced using less than 20 percent of the energy required to make clay brick. The specialty brick, including the Ambassador (3 5/8 x 2 1/4 x 15 5/8), Norman (3 5/8 x 2 1/4 x 11 5/8), and Roman (3 5/8 x 1 5/8 x 11 5/8) all are available in CalStar’s premium smooth finish in sizes that not all clay manufacturers can produce, the company says. The Ambassador also comes in a split face finish. CalStar reports that many architects like the modern look these sizes are able to achieve.

Four Home Design Trends Driving Masonry Demand in 2026
July 2026

As design trends continue to evolve, one theme remains consistent throughout 2026: homeowners want spaces that feel intentional, comfortable and enduring. According to Westlake Royal Building Products’ TrendLine platform, today's most influential trends e

The Modern Masonry Saw: Safety, Efficiency, and Smarter Cutting
July 2026

Masonry is a craft built on precision, strength, and durability. At the heart of every successful masonry project is one essential tool: the masonry saw. As technology evolves, so does the role of the saw on the jobsite. Today’s contractors are not just l

Getting the Finish Right on Burnished CMU
July 2026

The wall is complete. The lines are crisp. The coursing is tight, and the burnished CMU delivers exactly the refined appearance the design team envisioned. After weeks of coordination and careful installation, the project is final

Argo Community High School Performing Arts Center
July 2026

Argo Community High School is located in Summit, Illinois, just southwest of Chicago’s Midway Airport. In 2016, the Argo Community High School Board of Education and the school’s administration undertook the construction of a new performing