Masonry Magazine August 2002 Page. 26

Words: Allyn Kilsheimer, Craig Morgan
Masonry Magazine August 2002 Page. 26

Masonry Magazine August 2002 Page. 26
Pentagon The Phoenix Story
SERIES

They came to the conclusion that the damage was severe enough to warrant removing all five floors of the three outer rings between corridors 4 and 5.

Fire, water, and impact damage had made these areas unreliable, a much greater area than initially thought. Another decision was to use poured reinforced concrete for the wall instead of the original brickwork.

Fromboluti, the architect, was part of this team. "When we rebuilt Wedge 1, the original wall was masonry with a limestone façade. We reinforced that wall with steel. Another big difference is that this is a cavity wall, whereas in the original construction the limestone was attached right to the masonry so there was no cavity. We had to redesign the limestone wall to look like the old, non-cavity wall. That presented quite a challenge."

Craig Morgan, a senior associate working with Fromboluti, adds, "We worked with Masonry Arts to get the details done right. Usually the architect does a bunch of drawings, the job goes out to bid, everybody gripes about it. Then you get shop drawings and you fight over it. That process takes a long time. This job was different. We all worked on it together. That's why it went so fast-we're all on the same page."

They started pouring the Phoenix area on the southern corner. "They wanted the 'E' Ring done as fast as possible so we could put the blast windows in and get the stone process started as soon as possible," Bartram says. "That front wall was done three months earlier than anybody expected it to be done. When they were still pouring the last section of the 'E' Ring wall on the far North side, we were already up three or four floors with stone on the South side."

With all the trades gathered, with the speed of the Project at the forefront, the construction site started to take on the usual look of confusion. "When we first started, it was very difficult," admits Bartram. "The concrete crews were stripping forms, concrete trucks were coming and going, they had pump trucks set up in front of the building right in the center of the Phoenix area. Logistically, it was very difficult coordinating everything and moving around. Everyone wanted to occupy the same space at the same time."

But this was no ordinary site. This was The Phoenix Project, more emotional, more enthusiastic, more everything. As Bartram explains, "It got a little crazy once in awhile, but everything went a lot smoother than anybody thought it would. You have to give the credit to Allyn Kilsheimer. If it weren't for Allyn, none of this would have been possible. He doesn't have 'quit' in his vocabulary. If someone tells him he can't do something, you better believe it's going to be done. Allyn never looks backward; he just goes forward.

On June 11, 2002, a memorial piece of limestone from the damaged section was placed to cover a dedication capsule in the new wall.

Once the demolition was completed and the area cleared, work began immediately on the restoration.

September 11, 20

24 Masonry
August 2002
www.masonryshowcase.com


What Is Biophilic Design?
April 2025

Biophilic design integrates natural elements into built spaces to fulfill our innate connection to nature. Rooted in the biophilia hypothesis, it goes beyond aesthetics, enhancing well-being, health and productivity. 5 Ways to Incorporate Biophilic Desig

One For The Ages - The 75th Midyear
April 2025

“One for the ages” this is how I would describe the upcoming midyear to anyone who has never attended or are undecided about attending MCAAs 75th Anniversary at The Grand Hotel on Mackinac Island September 7-11 2025. In short “one for the ages” means so

A Greener Future Through Masonry
April 2025

When it comes to building a more sustainable future, the construction and building materials sector has a lot of room for growth. According to the most recent data, construction and building-related emissions are responsible for 40% of greenhouse gas emis

MASONRY STRONG Podcast Episode 19 Recap: Mike & Tom Finch
April 2025

On this episode of the MASONRY STRONG Podcast, Mike and Tom Finch join the set in Indianapolis to crack jokes, talk about how they both got started in this industry, and the ways they've seen this trade advance and evolve over the years. The Roots of a F